Newsroom   Site Map   Contact NERC

This is not phishing, this is art!
Read more here what this is about.
  
Advanced Search
 
About NERC Standards Compliance Assessments Events Analysis Programs 

 

Failed, Rejected, and Withdrawn SARs and Standards | Retired Standards

Standard Drafting Team Rosters | Standard Drafting Team Vacancies | Standards Projects Cross Reference

Standards Under Development Project Status Summary | Standards Under Development Anticipated Posting Calendar

From this page you can keep track of and link to all proposed reliability standards under development.
If you would like to propose a new reliability standard, please download and fill out a Standard Authorization Request (SAR) Form.

Reliability Standards - Under Development

Standard Title

Action

Start Date

End Date
Current Ballots
Project 2009-20 Interpretation of BAL-003-0 R4 and R5 by Energy Mark, Inc. Initial Ballot 11/20/09 12/07/09
Project 2009-17 Interpretation of PRC-004-1 and PRC-005-1 R2 by Y-W Electric and Tri-State G & T Initial Ballot 11/19/09 12/07/09
Project 2009-21 ― Cyber Security Ninety-day Response Initial Ballot 11/20/09 11/30/09
Posted for 30-day Pre-ballot Review (Open Ballot Pools)
Project 2009-24 Interpretation of EOP-005-1 R7 by FMPAJoin Ballot Pool 11/19/09 01/05/10
Project 2009-25 Interpretation of BAL-001-01 and BAL-002-0 by BPAJoin Ballot Pool 11/19/09 01/05/10
Project 2009-23 Interpretation of CIP-004-2 R3 by Army Corps of EngineersJoin Ballot Pool 10/29/09 12/01/09
Posted for Comment
Project 2008-12 ― Coordinate Interchange Standards Comment Form 11/10/09 12/11/09
Project 2007-23 Violation Severity Levels and
Project 2008-08 ― EOP VSL Revisions
Comment Form 11/03/09 12/03/09
Project 2006-08 ― Transmission Loading Relief Comment Form 10/27/09 11/30/09
Regional Reliability Standard MOD-024-RFC-01 Comment Form 10/27/09 12/11/09
Project 2007-04 ― Certifying System Operators Comment Form 10/21/09 11/20/09
Drafting Team Nominations Open
       
SARs and Standards Under Development (not currently posted for comment)
Functional Model Working Group
Regional Reliability Standard PRC-002-NPCC-1
Revisions to IRO-004 ― Require Timely Submission of Data
Project 2006-02 ― Assess Transmission and Future Needs
Project 2006-04 ― Backup Facilities
Project 2006-06 ― Reliability Coordination
Project 2006-07 ― Transfer Capabilities: ATC-TTC-CBM-TRM − MOD Standards
Project 2007-01 ― Underfrequency Load Shedding
Project 2007-02 ― Operating Personnel Communications Protocols
Project 2007-03 ― Real-time Operations
Project 2007-05 ― Balancing Authority Controls
Project 2007-06 ― System Protection Coordination
Project 2007-07 ― Vegetation Management − FAC-003-2
Project 2007-09 ― Generator Verification
Project 2007-11 ― Disturbance Monitoring
Project 2007-12 ― Frequency Response
Project 2007-17 ― Protection System Maintenance & Testing
Project 2008-01 Voltage and Reactive planning and control
Project 2008-05 ― Credible Multiple Element Contingencies − FAC-011-2
Project 2008-06 ― Cyber Security ― Order 706 (Version 2 VRFs and VSLs)
Project 2008-09 ― Interpretation of EOP-001-0 R1 by Regional Entity Compliance Managers
Project 2008-10 Interpretation of CIP-006-1 R1.1 by Progress Energy
Project 2009-01 Disturbance and Sabotage Reporting
Project 2009-02 Real-time Tools
Project 2009-05 ― Resource Adequacy Assessments
Project 2009-06  Facility Ratings
Project 2009-07 Reliability of Protection Systems
Project 2009-09 Interpretation of CIP-001-1 R2 by Covanta Energy
Project 2009-13 Interpretation of CIP-006-1 R1.1 by PacifiCorp
Project 2009-19 Interpretation of BAL-002-0 R4 and R5 by NWPP Reserve Sharing Group
Project 2009-22 Interpretation of COM-002-2 R2 by the IRC
Project 2009-26 Interpretation of CIP-004-1 by WECC
Standards Under Field Test
Project 2006-08 ― Transmission Loading Relief
Project 2007-18 ― Reliability-based Control
Continent-wide and Regional Standards Waiting for Board Adoption
Project 2007-23 Violation Severity Levels
Project 2008-07 ― Interpretation of EOP-002-2 R6.3 and R7.1 by Brookfield Power
Project 2008-08 ― EOP VSL Revisions
Project 2009-12 Interpretation of CIP-005-1 R4.2.2 and R1.3 by PacifiCorp
Pending Regulatory Filing
Reliability Standards Development Plan
Reliability Standards Development Procedure Version 7
BAL-502-RFC-01 — Planning Resource Adequacy Analysis, Assessment and Documentation
Pre-2006 ― Operate Within Interconnection Reliability Operating Limits IRO-007 through IRO-010
Project 2006-03 System Restoration and Blackstart
Project 2007-27 Interpretation of CIP-006 R1.1 by SCE&G
Project 2008-15 Interpretation of CIP-006-1a By US Army Corps of Engineers
Project 2008-18 Interpretation of TOP-005-1 and IRO-005-1 by Manitoba Hydro
Project 2009-10 Interpretation of PRC-005-1 R1 by Compliance Monitoring Processes Working Group (CMPWG)
Project 2009-11 Interpretation of IRO-010-1 R1.2 and R3 by WECC Reliability Coordination Subcommittee
Project 2009-14 Interpretation of TPL-002-0 R1.3.10 by PacifiCorp
Project 2009-15 Interpretation of MOD-001-1 R2 and R8 and MOD-029-1 R5 and R6 by NYISO
Project 2009-16 Interpretation of CIP-007-1 R2 by WECC
Project 2009-18 Withdraw Three Midwest ISO Waivers
Reliability Standards Filed and Pending Regulatory Approval
BAL-002-WECC-1 Contingency Reserve
FAC-501-WECC-1 Transmission Maintenance
IRO-006-WECC-1 Qualified Transfer Path Unscheduled Flow Relief
PRC-004-WECC-1 Protection System and Remedial Action Scheme Misoperation
TOP-007-WECC-1 System Operating Limits
VAR-002-WECC-1 Automatic Voltage Regulators
VAR-501-WECC-1 Power System Stabilizer
Cyber Security Order 706B Nuclear Plant Implementation Plan
ERCOT Request for Interpretation ― BAL-003-0, Requirements 2, 2.2, 5, and 5.1
Errata ― Various Standards Errata
Project 2006-01 ― System Personnel Training
Project 2006-07 ― Transfer Capabilities: ATC-TTC-CBM-TRM (MOD Standards)
Project 2007-14 ― Permanent Changes to Timing Tables in Coordinate Interchange Standards
Project 2007-24 ― Interpretation of TPL-002 and TPL-003 R1.3.12 and R1.3.2  by Ameren
Project 2007-26 ― Interpretation of TPL-002 and TPL-003 R1.3.12 and R1.3.2 by MISO
Project 2007-28 ― Interpretation of VAR-001-1 Voltage and Reactive Control by Dynegy
Project 2008-06 ― Cyber Security ― Order 706
Project 2008-11 ― Interpretation of VAR-002a by ICF Consulting
Project 2008-13 Interpretation of TOP-002-2 R11 by Orlando Utilities Commission
Project 2008-14 Cyber Security Violation Severity Levels
Project 2008-16 Transmission Operations Violation Severity Levels − TOP-004-2
Project 2009-08 Nuclear Plant Interface Coordination
Relay Loadability − PRC-023-1
Urgent Action SAR for Revision BAL-004-1

All comments should be forwarded to sarcomm@nerc.net.
Questions?  Contact Lauren Koller -
lauren.koller@nerc.net or 609-452-8060.